✅ Garden Bed Math
Compost or topsoil checklist
Garden or bed: Date:
- Bed length and width in feet
- Drop measured at three spots, averaged in inches
- Job named: yearly layer (compost) or depth back (compost and topsoil)
- Ratio picked: all compost, 1:1 or 1:2
- Cubic feet worked out (square feet x inches / 12), split by the ratio
- Bag sizes read off the bags, in cubic feet
- Bags rounded up for each material, or a bulk quote
- Bulk load looked at: dark, crumbly, earthy smell
Notes:
Garden Bed Math · gardenbedmath.com/soil/guides/compost-vs-topsoil/ · Planning guide, not a guarantee.