Patio and path base checklist

Patio or path: Length x width (ft): 811 ticket no.:

#StepDoneDate
1811 called; lines marked
2Outline staked; string at finished height
3Fall away from house: 1 in per 8 ft
4Paver thickness measured
5Gravel depth picked: 4 in drained, 6 in wet
6Dig = paver + 1 in sand + gravel
7Gravel, sand and edging ordered
8Plan for the dug soil
9Depth checked at corners and middle
10Gravel compacted in layers of 4 in or less
11Edge restraint on every open side
121 in sand screeded; nobody walks on it

Notes:

Source: Rochester Concrete Products paver installation guide, checked October 12, 2026. Planning checklist for foot traffic, not driveways. Wet ground, steps or walls: ask a supplier or contractor. · gardenbedmath.com/soil/patio-path-base/